Lean Six Sigma Training Guide
  • IASSC Free Training Guide
  • Free Lean Six Sigma Training Guide
  • ASQ Free Training Guide
  • Body of Knowledge
  • Practice Exams
    • Six Sigma Quick Training Tests >
      • Lean Six Sigma Practice Test 1
      • Lean Six Sigma Practice Test 2
      • Lean Six Sigma Practice Test 3
      • Lean Six Sigma Practice Test 4
      • Lean Six Sigma Practice Test 5
      • Lean Six Sigma Practice Test 6
      • Lean Six Sigma Practice Test 7
      • Lean Six Sigma Practice Test 8
      • Lean Six Sigma Practice Test 9
      • Lean Six Sigma Practice Test 10
      • Lean Six Sigma Practice Test 11
      • Lean Six Sigma Practice Test 12
    • Six Sigma DMAIC Training Tests >
      • DEFINE Six Sigma Training Test
      • MEASURE Six Sigma Training Test
      • ANALYZE Six Sigma Training Test
      • IMPROVE Six Sigma Training Test
      • CONTROL Six Sigma Training Test
    • IASSC, ASQ and Other Exams >
      • IASSC Six Sigma Black Belt Exam
      • IASSC Six Sigma Green Belt Exam
      • IASSC Six Sigma Yellow Belt Exam
      • Lean Six Sigma Exams By Topic >
        • I. Enterprise-Wide Deployment >
          • A. Enterprise-wide view
          • B. Leadership
        • II. Organizational Process Management and Measures >
          • A. Impact on stakeholders
          • B. Critical to x (CTx) requirements
          • C. Benchmarking
          • D. Business performance measures
          • E. Financial measures
        • IV. Define >
          • A. Voice of the customer
          • B. Project charter
          • C. Project tracking
        • V. Measure >
          • D. Basic statistics
      • ASQ Six Sigma Black Belt Exam
      • ASQ Six Sigma Green Belt Exam
  • Six Sigma Materials
    • The Problem Solving Strategy Y = f(x) in Lean Six Sigma
    • Value Stream Mapping Explained
    • Pareto Analysis And Pareto Chart Explained
    • Best 5 Free Online Degree Programs In 2017
    • Cost Of Poor Quality (COPQ) Explained
    • Best 4 Free Online Certifications To Boost Your Resume
    • Pareto Analysis and Pareto Chart
    • Why Six Sigma Certification?
    • Six Sigma Green Belt Training
    • General History of Six Sigma & Continuous Improvement
    • Walter Shewhart Biography
    • Basic Lean Six Sigma Metrics
    • How to Make a Histogram
    • Statistical Process Control Charts
    • Lean Six Sigma Term Glossary
    • Kaizen and Kaizen Blitz
    • Central Limit Theorem
    • Six Sigma Symbols
    • Six Sigma Tables >
      • Z Score Tables
      • T Distribution Table
      • Chi-Square Distribution Table
      • F Distribution Table
      • Poisson Distribution Table
      • Cumulative Poisson Distribution Table
    • Six Sigma Diagrams >
      • Choosing a Right Parametric Test
      • Choosing a Right Control Chart
      • Commonly Used Lean Six Sigma Flowchart Symbols
      • Ishikawa (Fishbone) Diagram
      • Histogram
      • Scatterplot
      • Check Sheet
      • Failure Mode and Effects Analysis (FMEA)
    • Lean Six Sigma Belt Roles and Responsibilities
    • 5S
    • How to get six sigma certified?
    • International Six Sigma Certification Association (IASSC) Exam Reference Document
    • Useful Websites and Tools
    • 10 Best Free Udemy Courses That You Can Take Online
    • 5 Best Udemy Courses You Can Take Today
    • The Complete Web Developer Course 2.0 You Can Take Online | Udemy
    • 12 Best Probability and Statistics Online Courses and Classes [2018 Guide]
    • 15 Best Data Science Degrees, Courses and Certifications [2018]
  • Six Sigma Glossary
    • 5 Whys
    • Analytical and Descriptive Statistics
    • Brainstorming
    • Cost Of Quality
    • Design for Six Sigma (DFSS)
    • Efficiency of Estimators
    • Process Maps and Flow Charts
    • Gap Analysis
    • Common & Special Cause Variation
    • Quality Function Deployment (QFD)
    • In Control Process
    • Interest-Based Bargaining
    • Internal Customer
    • ISO9000
    • Kaizen Blitz
    • Kanban
    • Kano Model
    • Key Performance Indicators (KPI)
    • Lean Production
    • Management Strategies
    • MANOVA
    • Multivariate Analysis
    • Pareto Charts
    • Pareto Principle
    • PEST Analysis
    • Porter's Five Forces Analysis
    • Factor Analysis
    • Procedures
    • Process
    • Project Charter
    • Project Sponsor
    • Pull Production System
    • QS9000
    • Random Sampling
    • Failure Mode & Effects Analysis (FMEA)
    • Rolled Throughput Yield
    • Root Cause Analysis
    • Scenario Planning
    • Seven Quality Tools
    • SIPOC Diagrams
    • Six Sigma
    • SWOT Analysis
    • Systematic Sampling
    • System (Quality System)
    • Team Tools
    • Theory of Constraints
    • Throughput
    • Total Productive Maintenance (TPM)
    • Touch Time
    • Value Stream Maps
    • Visual Factory
    • Work In Progress (WIP)
    • Work In Queue
    • Work Instructions
    • Big Y
    • Control Plan
    • Waste
    • Evolutionary Operation of Processes (EVOP)
    • Cause & Effect Diagrams
    • 5C
    • 5Z
    • Project Selection
    • 8D Process
    • Appraisal Cost
    • Audit
    • Baseline
    • Business Process Quality Management
    • Check Sheet
    • Unintended Consequences
    • Voice Of The Customer (VOC)
    • Critical to Customer (CTC)
    • Critical To Quality (CTQ)
    • Customer Focus
    • Efficiency
    • Empowerment
    • Entry Criteria
    • Exit Criteria
    • Voice Of The Process (VOP)
    • Just In Time (JIT) Manufacturing
    • KISS
    • DMAIC
  • Six Sigma Blog
  • Forum
  • About Me
  • Privacy Policy
  • Contact
  • Top Free Online Courses With Printable Certificates
  • Roman Numerals Chart

Work in Progress (WIP)

Home/Body of Knowledge/Work in Progress (WIP)
Previous: Value stream mappingAll topicsNext: Work in queue

Work in progress (WIP) is every unit that has started but is not yet finished — parts on the line, jobs in a queue, and tickets waiting between steps. In a Lean system the goal is to keep WIP low and visible, because unfinished work ties up cash, hides problems, and stretches lead time.

Little’s Law states the relationship clearly: average lead time equals WIP divided by throughput.

High WIP versus controlled WIP on a four-station line Two value streams. The top line has large piles of work between stations and a long lead time. The bottom line limits WIP with pull, so lead time shrinks even though the stations are the same. Northriver hinge line — same stations, different WIP Push: WIP piles up Blank Stamp Assemble Pack Lead time ≈ 7.5 days · throughput stuck behind queues LT Pull: WIP is capped Blank Stamp Assemble Pack Lead time shrinks as queues shrink · Little’s Law: lead time = WIP ÷ throughput LT Red stacks = unofficial inventory. Orange squares = a small, agreed WIP cap between stations.
Cutting WIP does not change the work content of each station. It shortens the time units spend waiting between them.
Work in progress (WIP) on a production line

What counts as WIP

Count any work that has left raw-material stores and has not reached finished-goods or the customer. That includes:

  • Parts sitting in a basket between machines.
  • A batch that is half stamped and waiting for the next setup.
  • Repair loops, rework cages, and “hold for quality” racks — they are still WIP.
  • In services: tickets in a backlog after intake, claims waiting on a review, or patients waiting between process steps.

Raw material that has not been released, and finished goods already transferred to the warehouse, are inventory too, but they are usually tracked separately from shop-floor WIP.

Why high WIP hurts

  • Lead time grows. Little’s Law is not a slogan. If Northriver’s assemble cell completes 40 hinge sets per day and 400 sets are sitting in queues, average lead time is ten days, even if each set is only touched for a few minutes. See touch time for the difference between work time and waiting time.
  • Cash is tied up. Every unfinished part is purchased material and labor that cannot be invoiced yet.
  • Quality problems hide. A bad stamp may sit for days before assembly finds it, so the process keeps making the same defect.
  • Space and handling grow. Piles need racks, forklift moves, and counts — a form of waste.
  • Priority fights start. When everything is in process, everything is urgent, and expedites become the unofficial scheduling system.

How to lower WIP without starving the line

The aim is a cap that is low enough to surface problems and high enough that stations are not idle from ordinary variation. Practical moves:

  1. Make WIP visible. Mark floor squares, use labeled totes, or post a simple board so anyone can see when a queue is over its cap. That is the same idea as a visual factory.
  2. Pull, don’t push. A downstream station withdraws work only when it has an empty slot. Kanban or a two-bin system is a common way to enforce the cap. Just-in-time is the broader policy of producing only what the next step needs.
  3. Reduce batch size and changeover. Large batches are a WIP decision dressed up as efficiency. Shorter setups let you run smaller lots.
  4. Balance the line and fix the constraint. WIP collects in front of the slowest step. Improving that step, or protecting it with a small, intentional buffer, is more useful than adding unofficial piles everywhere.
  5. Stop starting, start finishing. In office work, a WIP limit on “active” tickets (a Kanban column limit) often cuts lead time faster than adding people.

A value-stream map is the usual place to see WIP count, wait time, and process time on one picture. Basic Lean Six Sigma metrics then track WIP, throughput, and lead time as the cap changes.

A quick Northriver example

Suppose stamp, assemble, and pack can each finish 40 hinge sets a day, but unofficial racks hold 200 sets before assembly. Throughput cannot exceed 40 a day, so Little’s Law says those 200 sets alone add five days of lead time. If the team caps the rack at 40 sets and keeps throughput at 40 a day, those five days drop to one — without changing the machining time of a hinge.

Exam notes

IASSC and ASQ questions often ask you to recognize WIP as inventory between process steps, to name space, cash, obsolescence, and hidden defects as reasons to reduce it, and to apply Little’s Law (lead time = WIP ÷ throughput) with consistent units. Do not confuse WIP with finished-goods inventory or with cycle time.

Frequently asked questions

Is WIP the same as inventory?

WIP is a type of inventory: work that has started and is not finished. Inventory also includes raw material and finished goods. Lean treats all three as something to keep under control, but WIP is the pile that most directly stretches shop-floor lead time.

Does cutting WIP always raise throughput?

No. Throughput is limited by the constraint. Cutting WIP shortens lead time and exposes problems. If you cut the buffer in front of the constraint too far, throughput can fall. Set the cap with the constraint in mind.

How is WIP different from touch time?

Touch time is how long a unit is actually being worked on. WIP is how many units are in the system. High WIP usually means most of a unit’s lead time is waiting, not touching.

See also: touch time, value-stream mapping, Lean Six Sigma metrics, and the eight wastes.

Previous: Value stream mappingAll topicsNext: Work in queue

Related line-balancing and flow topics in this guide: work in queue, the theory of constraints, Yamazumi charts, and production line balancing.

Related guides

  • Attribute MSA (agreement analysis)
  • ANOVA and non-parametric tests
  • Correlation and regression
  • Normality and data transformation
  • Sample size and sampling
  • Statistical distributions
  • ASQ free training guide
  • Free Lean Six Sigma training guide

Last updated: November 12, 2026 · Published by Lean Six Sigma Training Guide (sixsigmatrainingfree.com) · How this guide is written