Lean Production
Lean production is a way of running operations whose ultimate goal is to eliminate waste, or muda: anything the customer would not pay for. It grew out of the Toyota Production System and rests on a few habits: remove activities that add no value, build quality in so defects are not passed on, let customer demand pull work through the process, keep the process flexible enough to follow changes in demand, and improve continuously through kaizen.
What does Lean production involve?
The original summary on this page still holds. A Lean production system involves:
- Eliminating activities that add no value — the eight wastes (TIMWOODS: transport, inventory, motion, waiting, overproduction, over-processing, defects, and unused skills).
- Eliminating defects in products and services, because quality should be built in, not inspected in afterward (see poka-yoke).
- Continuous improvement of processes and systems through kaizen.
- Pull production systems such as kanban, so work is made only when it is needed (see pull production system).
- Flexibility to change the process quickly as demand changes: short changeovers, cross-trained people, and small batches.
- Good, open communication with suppliers, so material arrives in the right quantity at the right time.
Where did Lean production come from?
Lean production is the Western name for the approach Toyota developed after the Second World War, known as the Toyota Production System, built on two pillars: just-in-time production and jidoka (stopping the line when a problem appears). The term “lean production” was introduced in 1988 by MIT researcher John Krafcik and spread through the 1990 book The Machine That Changed the World by Womack, Jones, and Roos. Their 1996 book Lean Thinking set out the five principles shown above.
Core Lean tools
| Tool | What it does |
|---|---|
| Value stream mapping | Shows every step, queue, and delay from order to delivery, so waste is visible. |
| 5S | Organizes the workplace: sort, set in order, shine, standardize, sustain. |
| Kanban and pull | Limit work in progress and produce to actual demand. |
| Poka-yoke | Mistake-proofs a step so a defect cannot be made or passed on. |
| TPM | Keeps equipment reliable so small buffers are enough. |
| Visual factory and andon | Make status and problems visible at a glance. |
| Standard work | Sets the current best way to do a task, as the base for improvement. |
| Kaizen events | Focused team improvements on one process in a few days. |
Lean production versus mass production
| Mass production | Lean production | |
|---|---|---|
| Batch size | Large batches to spread setup cost | Small batches, ideally one-piece flow |
| Inventory | Seen as a safety buffer | Seen as waste that hides problems |
| Scheduling | Push to a forecast | Pull to actual demand |
| Quality | Inspected at the end | Built in at each step |
| Improvement | Occasional, led by specialists | Continuous, by the people who do the work |
Lean production and Six Sigma
Lean and Six Sigma attack different problems and work well together. Lean removes waste and shortens lead time; Six Sigma reduces variation and defects with data and the DMAIC method. A Lean Six Sigma team might use a value stream map and kanban to cut a ten-day lead time and then a Six Sigma project to remove the defect that causes most of the rework that is left. For the full toolkit, see the tools of Lean Six Sigma.
Frequently asked questions
What is Lean production?
A way of running operations that removes waste — anything the customer would not pay for — by building quality in, producing to actual demand, keeping work flowing in small batches, and improving continuously.
What are the five principles of Lean?
Specify value from the customer’s point of view, map the value stream, create flow, establish pull, and pursue perfection by repeating the cycle.
Is Lean production the same as the Toyota Production System?
Lean production is the general name for the approach that Toyota developed as the Toyota Production System. The ideas are the same; “lean” is the term researchers used when they described it for other companies and industries.
What is the difference between Lean and Six Sigma?
Lean focuses on removing waste and speeding up flow; Six Sigma focuses on reducing variation and defects with statistical tools. Lean Six Sigma combines both.
See also: the 8 wastes, pull production system, kanban, just-in-time manufacturing, and value stream mapping.
Last updated: · Published by Lean Six Sigma Training Guide (sixsigmatrainingfree.com) · How this guide is written