Six Sigma Diagrams
The most-used Six Sigma diagrams are the SIPOC and process map (to see the process), the fishbone (Ishikawa) diagram and Pareto chart (to find and rank causes), the histogram and scatter plot (to see data), the check sheet (to collect it), the control chart (to tell signal from noise), and the FMEA worksheet (to rank risk). The table shows which DMAIC phase each one is usually used in.
| Diagram | What it shows | Main DMAIC phase |
|---|---|---|
| SIPOC | Suppliers, inputs, process, outputs, customers on one page | Define |
| Process map / flow chart | Steps, decisions, handoffs, delays | Define, Measure |
| Check sheet | Tally of how often each defect or event occurs | Measure |
| Histogram | Shape and spread of a set of measurements | Measure, Analyze |
| Pareto chart | The vital few categories causing most of the problem | Analyze |
| Fishbone (Ishikawa) | Possible causes grouped by category | Analyze |
| Scatter plot | Relationship between two variables | Analyze |
| FMEA | Failure modes ranked by risk | Analyze, Improve |
| Control chart | Process stability over time | Measure, Control |
How to choose the right Six Sigma diagram
Start from the question you need to answer, not from the tool. Each diagram answers one kind of question well. If you are not sure, the simplest diagram that answers the question is usually the right first choice.
| Your question | Diagram to start with |
|---|---|
| What is the process, and who are the customers? | SIPOC, then a process map |
| What does the customer actually need? | CTQ tree or Kano model |
| Where is time lost between steps? | Value stream map |
| How often does each defect happen? | Check sheet, then a Pareto chart |
| What does the spread of my measurements look like? | Histogram |
| Is the process changing over time? | Run chart or control chart |
| What could be causing the problem? | Fishbone diagram and 5 Whys |
| Do two variables move together? | Scatter plot |
| Which source of variation is largest? | Multi-vari chart |
| What could go wrong with the new process? | FMEA |
Process diagrams: seeing the work
SIPOC is a one-page, high-level view of a process. It lists suppliers, inputs, the five to seven main process steps, outputs, and customers. Teams use it in Define to agree on where the process starts and stops.
A process map or flow chart shows each step, decision, and handoff in order, using standard flowchart symbols. A swimlane version puts each department or role in its own row, which makes handoffs and waiting easy to see.
A value stream map is the Lean version. It adds process time, waiting time, and inventory between steps, so the team can see how much of the total lead time actually adds value. A spaghetti diagram traces the physical path a person or part travels on a floor plan; long, crossing lines point to wasted motion and transport.
Data diagrams: seeing the numbers
A check sheet is a simple form for collecting counts at the point where the work happens. A histogram groups measurements into bars to show center, spread, and shape, which tells you whether the data look normal, skewed, or have two peaks. A scatter plot places paired values on two axes to show whether one variable rises or falls with another; it shows correlation, not proof of cause.
A run chart plots data in time order around the median. A control chart adds a center line and statistically calculated control limits, so you can separate common cause from special cause variation. Use the guide to choosing the right control chart to pick the chart type for your data.
Cause and risk diagrams: finding why
A Pareto chart sorts categories from largest to smallest with a cumulative line, so the team works on the few categories that cause most of the problem first. A fishbone (Ishikawa) diagram groups possible causes under headings such as Man, Machine, Method, Material, Measurement, and Environment. The 5 Whys follows one cause chain down until it reaches something the team can act on.
The FMEA worksheet lists each way a process step could fail, its effect, and its cause, then scores severity, occurrence, and detection to rank the risks. It is used to protect a new or changed process before it goes live.
Example: one project, five diagrams
Illustrative example, not real data. A claims team wants to reduce rework on insurance forms. In Define, a SIPOC fixes the scope from “form received” to “claim paid.” In Measure, a check sheet over two weeks tallies the reasons forms are returned, and a run chart shows the daily rework rate. In Analyze, a Pareto chart of the check-sheet counts shows that two reasons, a missing policy number and an unsigned page, make up most of the returns; a fishbone session lists possible causes for each. In Improve, the team adds a required field and a signature check to the form, and runs an FMEA on the new step. In Control, a control chart of the daily rework rate tells the process owner whether the gain is holding.
Common mistakes with Six Sigma diagrams
- Drawing a fishbone before the problem statement is specific, so the causes are vague.
- Making a Pareto chart from too few data points, or from categories that overlap.
- Reading a scatter plot as proof that one variable causes the other.
- Adding control limits from the specification limits instead of from the process data.
- Mapping the process as it should work rather than as it really works today.
Exam notes
Certification exams such as IASSC and ASQ Green Belt and Black Belt usually test diagrams through short scenarios. Expect to identify which tool fits a question (for example, a Pareto chart to rank defect types, a scatter plot for two continuous variables, a control chart to judge stability), and to read a simple chart correctly. The Six Sigma symbols page lists the notation that often appears on these charts.
Frequently asked questions
What are the main Six Sigma diagrams?
The core set is SIPOC, process map, check sheet, histogram, Pareto chart, fishbone diagram, scatter plot, FMEA, and control chart. Lean projects also use the value stream map and spaghetti diagram.
Which diagram is used in the Define phase?
SIPOC is the standard Define diagram, often followed by a high-level process map and a CTQ tree that turns customer needs into measurable requirements.
What is the difference between a run chart and a control chart?
Both plot data in time order. A run chart uses the median as its center line and simple run rules. A control chart adds upper and lower control limits calculated from the process data, so it can flag special cause variation more formally.
Are the seven basic quality tools the same as Six Sigma diagrams?
They overlap. The seven basic quality tools are usually listed as the check sheet, histogram, Pareto chart, cause-and-effect (fishbone) diagram, scatter diagram, control chart, and a flow chart or stratification. Six Sigma uses all of them and adds diagrams such as SIPOC, FMEA, and the value stream map.
Lean Six Sigma Black Belt, Green Belt and Yellow Belt candidates can find useful diagrams here. These diagrams will help you study for a six sigma certification exam:
See also: Six Sigma symbols
Related guides
Last updated: · Published by Lean Six Sigma Training Guide (sixsigmatrainingfree.com) · How this guide is written