Lean Six Sigma Training Guide
  • IASSC Free Training Guide
  • Free Lean Six Sigma Training Guide
  • ASQ Free Training Guide
  • Body of Knowledge
  • Practice Exams
    • Six Sigma Quick Training Tests >
      • Lean Six Sigma Practice Test 1
      • Lean Six Sigma Practice Test 2
      • Lean Six Sigma Practice Test 3
      • Lean Six Sigma Practice Test 4
      • Lean Six Sigma Practice Test 5
      • Lean Six Sigma Practice Test 6
      • Lean Six Sigma Practice Test 7
      • Lean Six Sigma Practice Test 8
      • Lean Six Sigma Practice Test 9
      • Lean Six Sigma Practice Test 10
      • Lean Six Sigma Practice Test 11
      • Lean Six Sigma Practice Test 12
    • Six Sigma DMAIC Training Tests >
      • DEFINE Six Sigma Training Test
      • MEASURE Six Sigma Training Test
      • ANALYZE Six Sigma Training Test
      • IMPROVE Six Sigma Training Test
      • CONTROL Six Sigma Training Test
    • IASSC, ASQ and Other Exams >
      • IASSC Six Sigma Black Belt Exam
      • IASSC Six Sigma Green Belt Exam
      • IASSC Six Sigma Yellow Belt Exam
      • Lean Six Sigma Exams By Topic >
        • I. Enterprise-Wide Deployment >
          • A. Enterprise-wide view
          • B. Leadership
        • II. Organizational Process Management and Measures >
          • A. Impact on stakeholders
          • B. Critical to x (CTx) requirements
          • C. Benchmarking
          • D. Business performance measures
          • E. Financial measures
        • IV. Define >
          • A. Voice of the customer
          • B. Project charter
          • C. Project tracking
        • V. Measure >
          • D. Basic statistics
      • ASQ Six Sigma Black Belt Exam
      • ASQ Six Sigma Green Belt Exam
  • Six Sigma Materials
    • The Problem Solving Strategy Y = f(x) in Lean Six Sigma
    • Value Stream Mapping Explained
    • Pareto Analysis And Pareto Chart Explained
    • Best 5 Free Online Degree Programs In 2017
    • Cost Of Poor Quality (COPQ) Explained
    • Best 4 Free Online Certifications To Boost Your Resume
    • Pareto Analysis and Pareto Chart
    • Why Six Sigma Certification?
    • Six Sigma Green Belt Training
    • General History of Six Sigma & Continuous Improvement
    • Walter Shewhart Biography
    • Basic Lean Six Sigma Metrics
    • How to Make a Histogram
    • Statistical Process Control Charts
    • Lean Six Sigma Term Glossary
    • Kaizen and Kaizen Blitz
    • Central Limit Theorem
    • Six Sigma Symbols
    • Six Sigma Tables >
      • Z Score Tables
      • T Distribution Table
      • Chi-Square Distribution Table
      • F Distribution Table
      • Poisson Distribution Table
      • Cumulative Poisson Distribution Table
    • Six Sigma Diagrams >
      • Choosing a Right Parametric Test
      • Choosing a Right Control Chart
      • Commonly Used Lean Six Sigma Flowchart Symbols
      • Ishikawa (Fishbone) Diagram
      • Histogram
      • Scatterplot
      • Check Sheet
      • Failure Mode and Effects Analysis (FMEA)
    • Lean Six Sigma Belt Roles and Responsibilities
    • 5S
    • How to get six sigma certified?
    • International Six Sigma Certification Association (IASSC) Exam Reference Document
    • Useful Websites and Tools
    • 10 Best Free Udemy Courses That You Can Take Online
    • 5 Best Udemy Courses You Can Take Today
    • The Complete Web Developer Course 2.0 You Can Take Online | Udemy
    • 12 Best Probability and Statistics Online Courses and Classes [2018 Guide]
    • 15 Best Data Science Degrees, Courses and Certifications [2018]
  • Six Sigma Glossary
    • 5 Whys
    • Analytical and Descriptive Statistics
    • Brainstorming
    • Cost Of Quality
    • Design for Six Sigma (DFSS)
    • Efficiency of Estimators
    • Process Maps and Flow Charts
    • Gap Analysis
    • Common & Special Cause Variation
    • Quality Function Deployment (QFD)
    • In Control Process
    • Interest-Based Bargaining
    • Internal Customer
    • ISO9000
    • Kaizen Blitz
    • Kanban
    • Kano Model
    • Key Performance Indicators (KPI)
    • Lean Production
    • Management Strategies
    • MANOVA
    • Multivariate Analysis
    • Pareto Charts
    • Pareto Principle
    • PEST Analysis
    • Porter's Five Forces Analysis
    • Factor Analysis
    • Procedures
    • Process
    • Project Charter
    • Project Sponsor
    • Pull Production System
    • QS9000
    • Random Sampling
    • Failure Mode & Effects Analysis (FMEA)
    • Rolled Throughput Yield
    • Root Cause Analysis
    • Scenario Planning
    • Seven Quality Tools
    • SIPOC Diagrams
    • Six Sigma
    • SWOT Analysis
    • Systematic Sampling
    • System (Quality System)
    • Team Tools
    • Theory of Constraints
    • Throughput
    • Total Productive Maintenance (TPM)
    • Touch Time
    • Value Stream Maps
    • Visual Factory
    • Work In Progress (WIP)
    • Work In Queue
    • Work Instructions
    • Big Y
    • Control Plan
    • Waste
    • Evolutionary Operation of Processes (EVOP)
    • Cause & Effect Diagrams
    • 5C
    • 5Z
    • Project Selection
    • 8D Process
    • Appraisal Cost
    • Audit
    • Baseline
    • Business Process Quality Management
    • Check Sheet
    • Unintended Consequences
    • Voice Of The Customer (VOC)
    • Critical to Customer (CTC)
    • Critical To Quality (CTQ)
    • Customer Focus
    • Efficiency
    • Empowerment
    • Entry Criteria
    • Exit Criteria
    • Voice Of The Process (VOP)
    • Just In Time (JIT) Manufacturing
    • KISS
    • DMAIC
  • Six Sigma Blog
  • Forum
  • About Me
  • Privacy Policy
  • Contact
  • Top Free Online Courses With Printable Certificates
  • Roman Numerals Chart

Kaizen Blitz (Kaizen Event)

Home/Body of Knowledge/Kaizen Blitz (Kaizen Event)
Previous: Kaizen (continuous improvement)All topicsNext: Total productive maintenance

A kaizen blitz, also called a kaizen event or rapid improvement event, is a short, focused improvement project: a small cross-functional team spends three to five consecutive days on one process, studies how the work really happens, and puts tested improvements in place before the week ends.

It is one of the main improvement methods in Lean production and can be used on a product, a service, a system, or a process.

Kaizen blitz timeline: preparation, a five-day event, and 30-day follow-up Three stages from left to right. Preparation, two to four weeks before: pick the process, write the charter, collect baseline data. The event, days 1 to 5: train and see the current state, analyze waste and root causes, try changes, standardize and train, report out. Follow-up, about 30 days after: finish open actions, audit the new standard, and track the results against the baseline. Kaizen blitz: prepare, run the event in one week, then sustain Before: 2–4 weeks • Pick one process and scope • Sponsor signs the charter • Choose team and facilitator • Collect baseline data • Book people, space, and support (maintenance, IT) • Tell the area what to expect The event: days 1–5 Day 1 Train Go to gemba Map current state Day 2 Time study Find waste Root causes Day 3 Design the future state Try changes Day 4 Refine Measure again Write the standard Day 5 Train the area Report out Action list PDCA runs inside the week: plan (days 1–2), do and check (days 3–4), act (day 5) After: ~30 days • Close open actions • Audit the new standard • Track the metrics against the baseline • Fix what slipped • Share the result Original diagram; a typical schedule, adjusted to each event.
Most of the work that decides whether a kaizen blitz succeeds happens before day 1 (scope and baseline) and after day 5 (follow-up and audit).

When should you use a kaizen blitz?

A blitz works best when the problem sits inside one process or area that a team can see and change within a week. Typical targets are a cell or work area with long changeovers, a messy or unsafe layout, a step that builds up a queue, or an office process with too many hand-offs and approvals. It is a poor fit when the root cause is unknown and needs weeks of data, or when the fix needs capital spending or a system change that cannot happen during the event. Those problems usually suit a full DMAIC project instead.

Kaizen blitz team roles

RoleWhat they do
SponsorOwns the area or process, approves the charter, removes roadblocks, and attends the report-out. See project sponsor.
FacilitatorUsually a Lean or Six Sigma practitioner who has run events before. Plans the week, teaches the tools, keeps the team on scope and time.
Team leaderOften the area supervisor or process owner, who will keep the new standard running after the week.
OperatorsPeople who do the work every day. They are usually the largest group on the team.
SupportMaintenance, engineering, IT, or quality, on call for quick changes.
Outside eyesOne or two people from another area who ask the questions insiders no longer ask.

Teams of roughly six to ten people are common. The whole team works on the event full time for the week; part-time teams tend to lose momentum.

The kaizen event charter

  • Process and scope: where the process starts and stops, and what is out of bounds.
  • Problem statement: what is wrong today, with numbers from the baseline.
  • Goals and measures: for example lead time, work in progress, floor space, travel distance, changeover time, or first-pass yield, each with a baseline and a target.
  • Team, dates, and sponsor sign-off.
  • Limits: budget, what may be moved, and any safety or quality rules the team must keep.

What happens on each day of a kaizen event?

  1. Day 1, understand the current state. Short training on Lean basics and the eight wastes, then go to the gemba. Walk the process, draw a process map or a small value stream map, and confirm the baseline.
  2. Day 2, analyze. Time each step, separate value-added touch time from waiting, draw a spaghetti diagram of movement, and ask why problems happen (5 Whys, fishbone).
  3. Day 3, design and try. Sketch the future state, then try changes on the floor right away: move equipment, rebalance work, add visual controls or poka-yoke, apply 5S.
  4. Day 4, refine and standardize. Run the new method, measure it again, fix what does not work, and write the new work instructions.
  5. Day 5, train and report. Train everyone who works in the area, present before-and-after results to the sponsor and leaders, and agree a dated action list for anything not finished.

The original note on this page points out that some organizations may need to stop production in the area for part of the week to make the changes. That is why the date, the coverage plan, and any build-ahead of stock are agreed before the event starts.

Kaizen blitz versus everyday kaizen

Kaizen blitz (event)Everyday kaizen
Time frame3–5 days, planned in advanceContinuous, every day
Size of changeLarge step change in one areaMany small changes
WhoA dedicated cross-functional teamEveryone, in their own work
RiskGains slip back if there is no follow-upSlow to show a big result
Best forLayout, flow, changeover, a clear local problemKeeping and improving standards over time

The two work together: a blitz makes the step change, and daily kaizen keeps it and builds on it. A blitz with no daily kaizen behind it often drifts back to the old way within months.

Kaizen blitz team improving a process

Common reasons a kaizen blitz fails

  • Scope too big for one week, so the team ends with a list instead of a changed process.
  • No baseline, so nobody can show what improved.
  • Operators left out, so the new method is not owned by the people who must run it.
  • No follow-up, so the 30-day action list is never finished and the area slides back.
  • Using it to cut heads. If people expect the event to remove their jobs, they stop offering ideas.

Exam notes

Green Belt and Black Belt exams treat the kaizen blitz as a Lean Improve-phase tool. Remember: short (3–5 days), focused on one process, cross-functional team that includes operators, changes made during the event rather than recommended, and a follow-up period to sustain the gain.

Frequently asked questions

How long does a kaizen blitz last?

The event itself usually lasts three to five working days. Plan on two to four weeks of preparation before it and about 30 days of follow-up after it.

Is a kaizen blitz the same as a kaizen event?

Yes. Kaizen blitz, kaizen event, kaizen workshop, and rapid improvement event all describe the same short, team-based improvement project. "Blitz" stresses the speed.

What results should a kaizen blitz report?

The measures named in the charter, each with its baseline and the result at the end of the week, plus the open action list with owners and dates. Results are checked again at the 30-day follow-up.

Can a kaizen blitz be used outside manufacturing?

Yes. Offices, hospitals, labs, and service teams run kaizen events on processes such as order entry, patient intake, approvals, and month-end close. The steps are the same; the waste is usually waiting, hand-offs, and rework instead of motion and inventory.

See also: kaizen and the PDCA cycle, value stream mapping, the eight wastes, and Lean production.

Previous: Kaizen (continuous improvement)All topicsNext: Total productive maintenance

More on the gemba in this guide: what a gemba walk is, a gemba walk checklist, and gemba boards.

A kaizen blitz is one concentrated event. For kaizen as an everyday habit of small improvements, and how it connects to PDCA, see Kaizen (continuous improvement).

Related guides

  • ASQ free training guide
  • Free Lean Six Sigma training guide
  • Training guide home