DMAIC
DMAIC is the five-step improvement method used in Lean Six Sigma: Define, Measure, Analyze, Improve, and Control. Teams use it to frame a problem, collect honest data, find the vital few causes, test a fix, and then lock the gain in place so the process does not drift back.
What are the five DMAIC phases?
| Phase | Key question | Main outputs | Typical tools |
|---|---|---|---|
| Define | What is the problem, and for whom? | Problem statement, goal, scope, project charter, CTQs | SIPOC, VOC, CTQ tree |
| Measure | How big is it today? | Baseline of the project Y, data collection plan, measurement system check | process map, check sheet, MSA / Gage R&R, capability, DPMO / yield |
| Analyze | What really causes it? | Verified root causes (the vital few X’s) | fishbone, 5 Whys, Pareto, hypothesis tests |
| Improve | What fix works? | Tested and piloted solution, updated process | FMEA, poka-yoke, kaizen, DOE |
| Control | How do we keep the gain? | Control plan, standard work, handover to the process owner | control charts, control plan, work instructions |
For a new product or process, Six Sigma uses DMADV (Define, Measure, Analyze, Design, Verify) instead; see Design for Six Sigma.
Work the phases in order. In Define you write a clear problem, the customer need, and a project charter. In Measure you baseline the process and check the measurement system. In Analyze you look for root causes, not symptoms. In Improve you try and confirm a solution. In Control you install a control plan and charts so the new performance holds.
DMAIC practice tests
Use this hub with the free study guides and the phase-by-phase practice tests:
- Define-phase practice test and the Define answer key
- Measure-phase practice test and the Measure answer key
- Analyze-phase practice test and the Analyze answer key
- Improve-phase practice test and the Improve answer key
- Control-phase practice test and the Control answer key
- All DMAIC training tests, the ASQ free training guide, and the IASSC-focused training guide
Frequently asked questions
What does DMAIC stand for?
Define, Measure, Analyze, Improve, and Control — the five phases of a Six Sigma improvement project.
Can you skip a DMAIC phase?
You should not. Skipping Measure or Analyze is the usual way teams end up fixing a symptom. If the cause is already known and proven, the project may be a “just do it” change rather than a DMAIC project.
See also: Exit criteria by DMAIC phase
Related guides