Lean Six Sigma Training Test 10
(Answers can be found in the document below)
1) What significance level do Six Sigma practitioners commonly accept as a risk of committing Type I error:
a) 0.5 b) 0.005 c) 5 d) None of the above 2) A Lean Six Sigma team led by a Master Black Belt is trying to drastically reduce the time it takes to complete equipment changeovers at a car manufacturing factory. Which Lean Six Sigma tool is best suited for this objective? a) SMED b) Kanban c) 5 S d) U chart 3) A Green Belt is tasked by a supervising Black Belt to determine whether 4 types of defects occur independently of 3 classes of products. Which test is the Green Belt likely to use? a) ANOVA b) Contingency tables c) Two-way ANOVA d) Lavene’s test 4) In a normally distributed data 1 standard deviation on each side of the mean would include ________ of the total data? a) 68.2% b) 95.4% c) 99.7% d) 34.1% |
|
5) In the Lean Six Sigma DMAIC methodology the following is normally used in the “measure” phase?
a) Failure Mode and Effects Analysis (FMEA)
b) Kaizen Blitz
c) Measurement Systems Analysis (MSA)
d) Benchmarking
More practice tests:
- Lean Six Sigma Practice Test 1
- Lean Six Sigma Practice Test 2
- Lean Six Sigma Practice Test 3
- Lean Six Sigma Practice Test 4
- Lean Six Sigma Practice Test 5
- Lean Six Sigma Practice Test 6
- Lean Six Sigma Practice Test 7
- Lean Six Sigma Practice Test 8
- Lean Six Sigma Practice Test 9
- Lean Six Sigma Practice Test 11
- Lean Six Sigma Practice Test 12
lean_six_sigma_practice_test_10.pdf | |
File Size: | 69 kb |
File Type: |